Front entrance update

Front entrance update

Front entrance update TOORMINA February 2020 This Toormina home was in need of updated street appeal. New front door had been installed 2 years before. The existing beam had sustained some water damage and was in need of replacing. New hardwood beam was installed. New...
Poor drainage rectified Boambee- East January 2019

Poor drainage rectified Boambee- East January 2019

20190114_092126 Moisture issues with home 20190115_072249 New agg pipes laid All-sealed Barrier installed Barrier-installed Found-the-issue-with-bad-piping-and-seals Found the issue with bad piping and seals Gravel-replaced Gravel replaced Looking-good Moisture issues...